Aanbesteding Leveringen
Ierland – Elektriciteit – Legacy marine data and rights to publish legacy marine data to include all of Ireland 2026
Aankondiging gepubliceerd in het Engels. De AI-analyse vat ze voor u samen in uw taal.
Indienen offertes over 12 dagen — 5 november 2026 om 17.00 uur
“Ik wil deze opdracht”: opvolging, herinneringen en een offertedossier voorbereid door AI (geschiktheid, planning, kandidatuurbrief, technische memorie).
- Acheteur public
- Department of Climate Energy and the Environment
Dublin - Plaats van uitvoering
- Dublin
- Geraamde waarde
- € 30.000.000 excl. btw
- Vorm
- Raamovereenkomst
Contract van meerdere jaren: de aankoper bestelt naargelang zijn behoeften. - Procedure
- Openbare procedure
Elke onderneming mag een offerte indienen. - Publicatie
- 25 september 2026
- Taal van de aankondiging
- Engels
Analyse IA : y aller ou pas ?
Samenvatting in het Nederlands, criteria, te leveren documenten en verdict GO / NO GO in één minuut.
Onbeperkte analyses tijdens de 14 dagen Pro-proefperiode, zonder kaart.
Beschrijving
The next phase of the State’s multi-phase approach to offshore wind delivery has seen a move to a plan-led model that will ensure ORE development and deployment is managed in a planned, strategic, and sustainable way, and enable a balanced equilibrium between achieving ORE objectives, while maintaining environmental protection, the economic well-being of local communities, and consideration of other activities taking place in our shared marine space. In turn, this will provide greater certainty for all maritime users as to where development will be situated. An important step in advancing Phase Two will be the use of forward spatial planning, and specifically the requirement to establish Offshore Renewable Energy (ORE) Designated Areas that will take place according to legislative provisions for Designated Maritime Area Plans (DMAPs) within the Maritime Area Planning (MAP) Act, 2021.
This forward spatial planning will take an ecosystem-based approach, in line with EU and national policy, and will inter alia help to guide future investment and decision-making. The National DMAP will provide a spatial planning policy framework for offshore renewable energy deployment around Ireland’s coastline. The development and implementation of the National DMAP is currently underway.
It will aim to designate sufficient maritime area to deliver Ireland’s ambition of having 20 GW of offshore renewable energy by 2040. Commencing with the South Coast DMAP, the State is undertaking comprehensive surveying activities through our partners in the Marine Institute (MI) and Geological Survey Ireland (GSI) or private surveyors as required to facilitate potential future offshore renewable energy development. This is taking place through a comprehensive programme of survey activity within the geographical area of each DMAP proposed and/or marine areas identified for offshore wind development within the future DMAPs, and/or marine areas identified for offshore wind development within the final DMAPs approved by the Oireachtas.
In addition to the above anticipated programme of survey work, DCEE is seeking to supplement our own existing marine data with existing, high-quality, and unprocessed datasets which have been collected in recent years by private industry. This framework will focus on an all of Ireland approach (Irish Sea, Celtic Sea and Atlantic Ocean) and to potentially focus on other future DMAP areas as required. The maximum number of tenderers that can be placed on the Framework is twenty.
CPV-codes
Europese codes die het voorwerp van de opdracht indelen. Hiermee vinden wij de opdrachten van uw vak.
09310000
Partners en onderaannemers
Opdracht te groot of te breed om alleen aan te pakken? Schrijf in als tijdelijke vereniging, of bied u aan als onderaannemer.
Maak uw gratis account aan om te zien wie een partner zoekt voor deze opdracht, en u in te schrijven.
Ondernemingen die dit soort opdrachten binnenhalen in de regio
- Electric Ireland_9212 · 1 opdracht binnengehaald in 3 jaar
- Energia · 1 opdracht binnengehaald in 3 jaar
Mogelijke partners voor een tijdelijke vereniging of onderaanneming… en concurrenten die u best kent.
Gelijkaardige opdrachten die al gegund zijn
| Opdracht | Winnaar | Bedrag |
|---|---|---|
| Ierland – Elektriciteit – Provision of electricity Supply for the Government Departments and Security Services UEL005F 32 The Office of Government Procurement · 15 september 2026 |
Energia | € 103.520.982 |
| Ierland – Elektriciteit – Provision of Electricity Supply to Primary and Secondary Schools UEL005F - 34 The Office of Government Procurement · 15 september 2026 |
Electric Ireland_9212 | € 67.735.257 |
| Supply of electricity and gas - Facilities/7249 European Foundation for the Improvement of Living and Working Conditions · 8 augustus 2025 |
BORD GAIS ENERGY LIMITED | € 1.615.000 |
Bron: TED – Publicatiebureau van de Europese Unie © Europese Unie, verwerkte gegevens. Referentie 661914-2026.