Aanbesteding Werken
Design and Construction of Infrastructure & Superstructure Works including Electrification under the İstanbul North Rail Crossing Project (INRAIL)
Aankondiging gepubliceerd in het Engels. De AI-analyse vat ze voor u samen in uw taal.
Indienen offertes afgesloten — 14 oktober 2026 om 13.30 uur
- Acheteur public
- Ministry of Transport and Infrastructure, Directorate General of Infrastructure Investments
Ankara - Plaats van uitvoering
- Ankara
- Procedure
- Openbare procedure
Elke onderneming mag een offerte indienen. - Publicatie
- 21 augustus 2026
- Taal van de aankondiging
- Engels
Analyse IA : y aller ou pas ?
Samenvatting in het Nederlands, criteria, te leveren documenten en verdict GO / NO GO in één minuut.
Onbeperkte analyses tijdens de 14 dagen Pro-proefperiode, zonder kaart.
Beschrijving
The Ministry of Transport and Infrastructure, Directorate General of Infrastructure Investments, Türkiye (hereinafter - teh Ministry), has received financing from the World Bank through Ministry of Treasury and Finance towards the cost of the INRAIL Project. The Project is being jointly financed by the Asian Infrastructure Investment Bank, the Asian Development Bank, the European Bank for Reconstruction and Development, the Islamic Development Bank, and the OPEC Fund for International Development. The Project will finance the construction of a 127 km greenfield railway line designed to bypass the Istanbul Metropolitan Area and establish a high-capacity overland link across the Istanbul Strait (Bosphorus).
The line will be double-tracked, electrified, fully signalized, and mixed-use, capable of carrying both passengers and freight, with a maximum freight carrying capacity of 50 million tons per year. The proposed railway line will originate at Çayrova station on the Asian side and terminate at Çatalca station on the European side, crossing the Istanbul Strait by utilizing the existing track space allocated on the Yavuz Sultan Selim Bridge (YSS Bridge), also known as the Third Bosphorus Bridge, located at the northern end of the Istanbul Strait. The Ministry intends to apply a portion of the loan proceeds toward payments under the contract(s) for the "Design and Construction of Infrastructure and Superstructure Works, including Electrification" subdivided into four Lots as listed below.
The scope of works covered under this procurement package as a whole (all four lots together) encompasses the design and construction including electrification of 122.3 km of double-track main line and 4.7 km of single-track connection lines, 5 twin-tube Tunnel Boring Machine (TBM) tunnels totaling 36.2 km, 22 double-track New Austrian Tunneling Method (NATM) tunnels totaling 23.3 km, 17 cut-and-cover tunnels totaling 3.7 km, two viaducts and 40 bridges totaling 22.1 km, Stations, etc. The scope of works covered under each lot is specified in the RFP document. The Telecommunication and Signalling Works are not included in this procurement package and will tendered separately.
The Ministry now invites sealed Proposals from eligible Proposers for the Design and Construction of Infrastructure & Superstructure Works including Electrification subdivided into the four lots below. Proposers may submit Proposal for one or more lot(s): Lot 1 — Construction and Electrification Works for the Çayrova – Sabiha Gökçen Airport – Kurtdomu Corridor (28,49 km); Lot 2 — Construction and Electrification Works for the Kurtdomu – Alibahadr Corridor (25,76 km); Lot 3 — Construction and Electrification Works for the Alibahadr – YSS Bridge – Mithatpaa Corridor (32,14 km); Lot 4 — Construction and Electrification Works for the Mithatpaa – stanbul Airport – Çatalca Corridor (39,49 km).
4 percelen
- Construction and Electrification Works for the Çayırova – Sabiha Gökçen Airport – Kurtdoğmuş Corridor (28,49 km)
- Construction and Electrification Works for the Kurtdoğmuş – Alibahadır Corridor (25,76 km)
- Construction and Electrification Works for the Alibahadır – YSS Bridge – Mithatpaşa Corridor (32,14 km)
- Construction and Electrification Works for the Mithatpaşa – İstanbul Airport – Çatalca Corridor (39,49 km)
CPV-codes
Europese codes die het voorwerp van de opdracht indelen. Hiermee vinden wij de opdrachten van uw vak.
45234100
Winnende prijzen van vergelijkbare opdrachten
- Een kwart onder
- € 4.592.932
- Mediaan
- € 7.193.411
- Een kwart boven
- € 9.344.351
Gegunde bedragen excl. btw van de voorbije 3 jaar voor 164 opdrachten uit dezelfde CPV-groep (4523…), zonder raamovereenkomsten. De helft van de opdrachten ligt tussen beide kwartielen. Bron TED: vooral opdrachten boven de Europese drempels, dus eerder hoge bedragen.
Partners en onderaannemers
Opdracht te groot of te breed om alleen aan te pakken? Schrijf in als tijdelijke vereniging, of bied u aan als onderaannemer.
Maak uw gratis account aan om te zien wie een partner zoekt voor deze opdracht, en u in te schrijven.
Gelijkaardige opdrachten die al gegund zijn
| Opdracht | Winnaar | Bedrag |
|---|---|---|
| WA/OND/D100/2026/1 Wegenonderhoud in de vervoersregio Kempen Perceel 1: VVR Kempen noord Perceel 2: VVR Kempen zuid Vlaamse Overheid · 19 oktober 2026 |
Van Doorn Geldermalsen Bv | € 9.097.904 |
| Kokerwerken en bijkomende aanleg Bredene Fluvius System Operator cv (Speciale Sectoren) · 15 oktober 2026 |
TASOZ | € 667.772 |
| Stad Lier: Weg- en rioleringswerken in Marnixdreef - Ravestijn - Bist - Kesselsesteenweg (ventweg) Pidpa · 14 oktober 2026 |
APK Wegenbouw N.V. | € 5.650.602 |
| Wegenonderhoud in de vervoersregio Antwerpen Perceel 1: VVR Antwerpen oost Perceel 2: VVR Antwerpen west Vlaamse Overheid · 14 oktober 2026 |
A.B.O.G. SOGA |
€ 4.512.397 |
| Gemeente Aartselaar: Weg- en rioleringswerken in Kapellestraat, Laar en Lindelei Pidpa · 6 oktober 2026 |
TM Vermetten Wegenbouw - De Peuter | € 9.043.059 |
Bron: TED – Publicatiebureau van de Europese Unie © Europese Unie, verwerkte gegevens. Referentie 580920-2026.