Publizoom

Award notice Services

Multi- Party Framework Agreement for HSE West Architect Services (Including Planner and BIM) - FW 05 Non Acute Healthcare Capital Works - Project Value €15M to €60M excl. Vat for HSE West

Public buyer
Health Service Executive (HSE)
Kildare
Place of performance
Kildare
Estimated value
€400,000,000 excl. VAT
Amount awarded
€600,000,000 excl. VAT
Planned end of contract
10 June 2030
likely re-tender around December 2029
Bids received
8
Form
Framework agreement
Multi-year contract: the buyer places orders as needs arise.
Procedure
Open procedure
Any company may submit a bid.
Publication
6 July 2026
Notice language
English

AI analysis: go for it or not?

Summary in English, criteria, documents to provide and a GO / NO GO verdict in one minute.

Create my free account

Unlimited analyses during the 14-day Pro trial, no card needed.

Description

Multi- Party Framework Agreement for HSE West Architect Services (Including Planner and BIM) Framework 2025 - Framework 05 Non Acute Healthcare Capital Works - Project Value €15M to €60M excl. Vat for HSE West region (Galway, Mayo and Roscommon). The Initial project will consist of the construction of a new build 75 bed Community Nursing unit (CNU) within the Ballina District Hospital campus with direct linkages into the existing Ballina District Hospital.

The new build 75 bed Community Nursing unit (CNU) will consist of 3 floors with 25 single ensuite bed room accommodation to HIQA standards for Residential Care Settings for Older People in Ireland at each level Ground Floor, First Floor, Second Floor (level 0,1, 2) along with linkages to existing hospital street, new stairways, service lift and new 2 Nr. Bed Lifts, including new carpark areas, etc. Note: on the Ground Floor there will be 10 single ensuite bedrooms which will be allocated to residents with dementia.

There will also be extensive re-planning, upgrade works and reconfiguration of the existing district hospital female wing including physiotherapy area within the single storey and the two-storey central building structure, to provide commercial production kitchen with ancillary support rooms, physiotherapy area, laundry, staff changing and Day-care Services, etc; to complete the interface works with new the 75-bed CNU unit on site. The floor area of this project is in the region of 10,834 m2 which consists of the following: Demolishing the existing building structure on site, Construction and fit-out of a new 75 bed Community Nursing unit over 3 floors and roof top M E Plant room include extensive garden areas for the CNU, Refurbishment of the Existing Main District Hospital, Construction of new Car parking areas on site, Construction of a new Sub-station building including generator room and the Construction of a new medical building. Each element of building works, Demolishing, Diversion of Underground Services, construction of the new 75 bed CNU, etc, will be tendered as a separate construction contracts (such as enabling works packages main construction package), subject to statutory approvals, HSE Approvals, Funding etc., Please see SAQ document pack.

Awarded to

CPV codes

European codes that classify what the contract is about. They are how we find the tenders for your trade.

71200000 71410000

Winning prices for comparable contracts

A quarter below
€215,840
Median
€280,720
A quarter above
€1,361,885

Amounts awarded (excl. VAT) over the last 3 years for 13 contracts in the same CPV group (7120…), excluding framework agreements. Half of the contracts fall between the two quartiles. TED source: mostly contracts above the EU thresholds, so amounts tend to be high.

Similar contracts already awarded

ContractWinnerAmount
Multi- Party Framework Agreement for HSE Design Team Services Framework 2024 - Framework 04 Acute Healthcare Capital Works - Project Value €15M to €60M excl. VAT for HSE NE
Health Service Executive (HSE) · 2 October 2026
Van Dijk Architects_29337
Reddy Architecture + Urbanism
Kennedy FitzGerald Architects
McCauley Daye O'Connell Architects
Isherwood and Ellis_95501
Pascall+Watson
Scott Tallon Walker Architects_50999
Mulcahy McDonagh and Partners Ltd._19889
AECOM Ireland Limited_15958
WH Stephens
Tetra Tech Consulting Ireland Limited
AtkinsRéalis_10323
Tetra Tech Ireland Limited
Semple and McKillop Ltd_50796
IN2 Design Partnership Ltd_95680
Hayes Higgins Partnership
Troup Bywaters and Anders
O'Connor Sutton Cronin_19870
HLCE Limited
TJ O'Connor and Associates
PUNCH Consulting Engineers
Maurice Johnson and Partners
Michael Slattery Associates
GARLAND
KSN Project Management
Varming Consulting Engineers Ltd.
BTY Ireland Ltd.
i3PT Certification Association_95120
€600,000,000
Multi-Party Framework Agreement for HSE Design Team Services Framework 2024 – FW05: Non-Acute Healthcare Capital Works – project value €15M - €60M excl. VAT for Dublin North, Swords Office
Health Service Executive (HSE) · 17 September 2026
Reddy Architecture + Urbanism
Coady Partnership Architects Limited T/A COADY Architects
McCauley Daye O'Connell Architects
Scott Tallon Walker Architects_50999
Pascall+Watson
Moloney O'Beirne Architects
Oberlanders Group LLP
McGahon Surveyors Ltd.
Mulcahy McDonagh and Partners Ltd._19889
Tom McNamara and Partners_19459
WH Stephens
AtkinsRéalis_10323
Hayes Higgins Partnership
Semple and McKillop Ltd_50796
J.V. Tierney and Co (2002) Ltd
DELAP and WALLER
Tetra Tech Ireland Limited
IN2 Design Partnership Ltd_95680
Cronin and Sutton Consulting
PUNCH Consulting Engineers
Roughan and O'Donovan_3051
Curtins Consulting Limited
Meinhardt UK Ltd
HLCE Limited
Arup _4744
Michael Slattery Associates
AECOM Ireland Limited_15958
KSN Project Management
Varming Consulting Engineers Ltd.
BTY Ireland Ltd.
i3PT Certification Association_95120
GARLAND
ORS
Sweco Ireland Limited_113792
€600,000,000
Multi-Party Framework Agreement for HSE DT Services Framework 2024 – FW02: Acute Healthcare Capital Works – project value €1M - €15M excl. VAT for RHA A: Dublin North
Health Service Executive (HSE) · 14 September 2026
HLM Architects_179700
TODD Architects Ltd
Lawlor Burns and Associates_37115
Mulcahy McDonagh and Partners Ltd._19889
McGahon Surveyors Ltd.
AtkinsRéalis_10323
WH Stephens
O' Reilly Hyland Tierney Ltd
IN2 Design Partnership Ltd_95680
MARSON-MEP Consulting Engineers Limited
Hayes Higgins Partnership
Douglas Carroll Consulting Engineers
TOBIN Consulting Engineers_8682
O'Connor Sutton Cronin_19870
Malone O'Regan_11849
KSN Project Management
BTY Ireland Ltd.
Troup Bywaters and Anders
ORS
€600,000,000
Multi-Party Framework Agreement for HSE DTS Framework 2024 – FW02: Acute Healthcare Capital Works – project value €1M - €15M excl. VAT for RHA B Dublin and Midlands, IHA1 and IHA 2
Health Service Executive (HSE) · 19 August 2026
TODD Architects Ltd
BDP_45462
Cullen Payne Architects_28820
AtkinsRéalis_10323
MJ Turley + Associates
Deasy Walley Partnership_45539
Brendan Merry and Partners
Mulcahy McDonagh and Partners Ltd._19889
O'Connor Sutton Cronin and Associates (MandE) Ltd.
Varming Consulting Engineers Ltd.
Douglas Carroll Consulting Engineers
DELAP and WALLER
Matt O Mahony and Associates EO
Curtins Consulting Limited
Crocon Engineers Limited EO
O'Connor Sutton Cronin_19870
Hayes Higgins Partnership
Nicholas O'Dwyer Ltd.
Molony and Millar
KSN Project Management
BTY Ireland Ltd.
AECOM Ireland Limited_15958
Krystyna Rawicz and Associates
–
Multi-Party Framework Agreement for HSE Design Team Services 2025 - Major Capital Works DSE project value €50m - €400m excl. VAT - Employer’s Representative Services
Health Service Executive (HSE) · 16 July 2026
AECOM Ireland Limited_15958
Turner and Townsend Ltd
AtkinsRéalis_10323
KSN Project Management
BTY Ireland Ltd.
€50,000,000

Source : TED – Office des publications de l'Union européenne © Union européenne, données retraitées. Reference 461828-2026.