Publizoom

Award notice Services

Multi- Party Framework Agreement for HSE West Building Services Engineering (M+E) - FW 05 Non Acute Healthcare Capital Works - Project Value €15M to €60M excl. Vat for HSE West

Public buyer
Health Service Executive (HSE)
Kildare
Place of performance
Kildare
Estimated value
€300,000,000 excl. VAT
Amount awarded
€600,000,000 excl. VAT
Planned end of contract
16 June 2030
likely re-tender around December 2029
Bids received
6
Form
Framework agreement
Multi-year contract: the buyer places orders as needs arise.
Procedure
Open procedure
Any company may submit a bid.
Publication
13 July 2026
Notice language
English

AI analysis: go for it or not?

Summary in English, criteria, documents to provide and a GO / NO GO verdict in one minute.

Create my free account

Unlimited analyses during the 14-day Pro trial, no card needed.

Description

Multi- Party Framework Agreement for HSE West Building Services Engineering (M+E) Framework 2025 - Framework 05 Non Acute Healthcare Capital Works - Project Value €15M to €60M excl. Vat for HSE West region (Galway, Mayo and Roscommon). The Initial project will consist of the construction of a new build 75 bed Community Nursing unit (CNU) within the Ballina District Hospital campus with direct linkages into the existing Ballina District Hospital.

The new build 75 bed Community Nursing unit (CNU) will consist of 3 floors with 25 single ensuite bed room accommodation to HIQA standards for Residential Care Settings for Older People in Ireland at each level Ground Floor, First Floor, Second Floor (level 0,1, 2) along with linkages to existing hospital street, new stairways, service lift and new 2 Nr. Bed Lifts, including new carpark areas, etc. Note: on the Ground Floor there will be 10 single ensuite bedrooms which will be allocated to residents with dementia.

There will also be extensive re-planning, upgrade works and reconfiguration of the existing district hospital female wing including physiotherapy area within the single storey and the two-storey central building structure, to provide commercial production kitchen with ancillary support rooms, physiotherapy area, laundry, staff changing and Day-care Services, etc; to complete the interface works with new the 75-bed CNU unit on site. The floor area of this project is in the region of 7,960 m2 which consists of the following: Demolishing the existing building structure on site, Construction and fit-out of a new 75 bed Community Nursing unit over 3 floors and roof top M E Plant room include extensive garden areas for the CNU, Refurbishment of the Existing Main District Hospital, Construction of new Car parking areas on site, Construction of a new Sub-station building including generator room and the Construction of a new medical building. Each element of building works, Demolishing, Diversion of Underground Services, construction of the new 75 bed CNU, etc, will be tendered as a separate construction contracts (such as enabling works packages main construction package), subject to statutory approvals, HSE Approvals, Funding etc., Please see SAQ document pack.

Awarded to

CPV codes

European codes that classify what the contract is about. They are how we find the tenders for your trade.

71321000 71334000

Winning prices for comparable contracts

A quarter below
€74,430
Median
€114,768
A quarter above
€333,075

Amounts awarded (excl. VAT) over the last 3 years for 12 contracts in the same CPV group (7132…), excluding framework agreements. Half of the contracts fall between the two quartiles. TED source: mostly contracts above the EU thresholds, so amounts tend to be high.

Similar contracts already awarded

ContractWinnerAmount
Multi-Party Framework Agreement for HSE Design Team Services 2025 - Major Capital Works DSE project value €50m - €400m excl. VAT - Quantity Surveying Services
Health Service Executive (HSE) · 16 July 2026
AtkinsRéalis_10323
AECOM Ireland Limited_15958
O' Reilly Hyland Tierney Ltd
Cumming Group Ireland
Linesight
€50,000,000
Major capital works projects (€50M+) at RHA B lot 2 Acute Group B at St James’s Hospital; Tullamore Hospital; Coombe Hospital and Mullingar Hospital
Health Service Executive (HSE) · 14 July 2026
AtkinsRéalis_10323
BTY Ireland Ltd.
AECOM Ireland Limited_15958
Mulcahy McDonagh and Partners Ltd._19889
O' Reilly Hyland Tierney Ltd
Tetra Tech Ireland Limited
BDP_45462
J.V. Tierney and Co (2002) Ltd
Arup _4744
GARLAND
BB7 Consulting Limited
AFEC ENGINEERING_115462
FCC Fire Cert Ltd.
Maurice Johnson and Partners
KSN Project Management
Mott MacDonald Ireland_19102
Troup Bywaters and Anders
Varming Consulting Engineers Ltd.
Scott Tallon Walker Architects_50999
Molony and Millar
MCA Architects
TODD Architects Ltd
€25,000,000
Multi- Party Framework Agreement for HSE West Quantity Surveying Services - FW 05 Non Acute Healthcare Capital Works - Project Value €15M to €60M excl. Vat for HSE West
Health Service Executive (HSE) · 13 July 2026
Tom McNamara and Partners_19459 €400,000,000
FCC/117/25.F Multi-Party Framework Agreement for the Provision of Engineering Consultancy Services for Bridge Rehabilitation, Assessments, and Inspections (2025–2029) – Fingal County Council
Fingal County Council_371 · 13 October 2026
Clandillon Civil Consulting €2,000,000
Upgrade of Tory GWS
Tory Island Group Water Scheme · 5 October 2026
Stantec_Ireland_63567 €601,739

Source : TED – Office des publications de l'Union européenne © Union européenne, données retraitées. Reference 481816-2026.