Publizoom

Award notice Services

81320174 - International Consultancy for the Development of on-grid Renewable Energy Projects and Framework in Nigeria - Lot 1

Notice published in German. The AI analysis summarises it for you in your language.

Public buyer
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH
Eschborn
Place of performance
Eschborn
Amount awarded
€1 excl. VAT
Planned end of contract
10 February 2028
likely re-tender around August 2027
Bids received
4
Procedure
Open procedure
Any company may submit a bid.
Publication
29 July 2026
Notice language
German

AI analysis: go for it or not?

Summary in English, criteria, documents to provide and a GO / NO GO verdict in one minute.

Create my free account

Unlimited analyses during the 14-day Pro trial, no card needed.

Description

NESP is currently in its third phase (June 2023 - May 2027) and still funded by the European Union (EU) and the German Federal Ministry for Economic Cooperation and Development (BMZ). The programme is implemented by the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH in collaboration with Nigeria"s Federal Ministry of Power. Its core objective is to foster investments in domestic renewable energy (RE) and energy efficiency (EE) markets while improving electricity access for disadvantaged, mostly rural communities, including those in conflict-affected areas.

Background With a fast-growing population now estimated at 227 million, Nigeria is the most populated country in Africa. With only 60% of Nigeria"s population connected to the main grid, the rest remains unconnected. Power supply shortages do not only affect the living standards of Nigerians, but also the competitiveness of Nigeria"s businesses and industries.

In most cases, Nigerians resort to expensive and polluting captive diesel generation to satisfy their power needs. As a result, Nigeria has become one of the largest markets for diesel generators in the world. With its huge natural and fossil resources, Nigeria is Africa's energy giant and energy exports are essential for the Nigerian economy transition.

However, due to the destabilization of oil prices there is an increasing interest by Nigeria to accelerate the energy transition by increasing investments in sustainable energy. The Energy Transition Plan (ETP) that was adopted in February 2022 provides an ambitious, long-term strategy for the energy transition. It builds on the Sustainable Energy for ALL (SEforALL) Action Agenda and its Vision 30:30:30, setting the target to increase power generation capacity to 30 gigawatts (GW) and the RE share in the electricity mix to 30% until 2030.

Important climate policy documents, particularly the Nationally Determined Contributions (NDC) and the National Policy on Climate Change, have been updated to show a higher level of ambition. Despite reforms in the past decade, Nigeria"s energy sector still faces significant challenges. On-grid generation is limited by weak transmission infrastructure, while the distribution side suffers from DisCos" liquidity crises and high technical and commercial losses.

Electricity demand is estimated at 30,000 MW, compared to an average peak generation of 5,000 MW. Off-grid progress, particularly in mini-grids, is hindered by barriers such as limited forex access and technical capacity. To address these gaps, the Nigerian government passed the Electricity Act, 2023, repealing the Electric Power Sector Reforms Act, 2005.

The Act decentralises the electricity market, empowering state governments to establish State Electricity Markets (SEMs). It prioritises RE deployment and aims to attract private investment into the Nigerian Electricity Supply Industry (NESI). Several states are already setting up SEMs, but most lack the tools, skills, and resources to implement them effectively.

Therefore, NESP is providing targeted technical support that will focus on the following key output indicators: On-grid (Premium Grids) Output indicators:

  1. Identification and mapping of suitable areas for premium grid projects in cooperation with DisCos
  2. Promote awareness and experiences with an implemented premium grid project with RE generation component.
  3. Support to DisCos to develop and implement economically sound business models and project implementation plans, network analysis and develop contractual documents Framework (Energy Transition Policy and State Electricity Market support) 1.

New or improved laws, regulations or instruments to achieve the energy policy goals prioritised in the Nigerian Energy transition plan (e.g, energy access, renewable energy) 2. Support 5 states on their respective State Electricity Market through the development of policies, laws, or instruments to advance RE investment. The procedure is divided into two lots.

This is Lot 1.

Awarded to

CPV codes

European codes that classify what the contract is about. They are how we find the tenders for your trade.

80000000

Winning prices for comparable contracts

A quarter below
€313,157
Median
€1,019,097
A quarter above
€1,585,682

Amounts awarded (excl. VAT) over the last 3 years for 16 contracts in the same CPV group (8000…), excluding framework agreements. Half of the contracts fall between the two quartiles. TED source: mostly contracts above the EU thresholds, so amounts tend to be high.

Similar contracts already awarded

ContractWinnerAmount
Akademie für Internationale Zusammenarbeit: S4-Qualifizierung
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH · 13 October 2026
BearingPoint GmbH –
81322839-Formation des bénéficiaires et partenaires du Cluster Économie Résiliente en soft skills, green skills et inclusion
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH · 30 September 2026
GOPA Pro GmbH €423,747
81322602 - International Consultancy for the Development of off-grid Renewable Energy Projects - Lot 2
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH · 5 August 2026
Inensus GmbH €1
REZ SW 45ind JC Deutsche Weinstraße
Bundesagentur für Arbeit, Regionales Einkaufszentrum Südwest · 21 October 2026
BFB e.V. –
REZ Bayern_45ind_JC Nürnberg Stadt
Bundesagentur für Arbeit, Regionales Einkaufszentrum Bayern, (mit Zuständigkeit für Bayern und Sachsen) · 20 October 2026
bfz gGmbH Mittelfranken –

Source : TED – Office des publications de l'Union européenne © Union européenne, données retraitées. Reference 525902-2026.