Award notice Supplies
NEA and SLF02 – Procurement of 400 kV and 132 kV cable systems
- Public buyer
- Energinet Eltransmission A/S
Fredericia - Place of performance
- Fredericia
- Estimated value
- €113,300,000 excl. VAT
- Amount awarded
- €128,605,731 excl. VAT
- Planned end of contract
- 21 October 2032
likely re-tender around April 2032 - Bids received
- 4
- Procedure
- Competitive negotiated procedure
You first submit an application; shortlisted candidates bid, then negotiate with the buyer. - Publication
- 20 August 2026
- Notice language
- English
AI analysis: go for it or not?
Summary in English, criteria, documents to provide and a GO / NO GO verdict in one minute.
Unlimited analyses during the 14-day Pro trial, no card needed.
Description
The Contracting Authority wants to purchase delivery of approximately 490 km 400 kV single core cable XLPE-insulated land cable and 15 km 132 kV single core XLPE-insulated land cable, joints and terminations and installation of joints and terminations. The deliverables are divided into three lots: Lot 1 – NEA, Lot 2 - NEA and Lot 3 – SLF02. The scope of the three tendered lots are described in detail in the enclosed tender documents.
For further detail regarding the purchase, reference is made to the tender documents. However please note the following: The Contracting Authority will also accept solutions with a welded aluminum sheath. In case a welded aluminum sheath is offered, the sheath is allowed to carry the full fault current without the support of a wire screen.
For further information see the technical requirements c.f. doc. no. 24/13859-18. It is possible to apply for prequalification for one, two or all three lots. The application should clearly state for which lot it concerns.
Subsequent tenders may be submitted for Lots the tenderer is prequalified for. If an applicant applies for prequalification for all three Lots, but does not have the capacity for all, this must be clearly stated in the application. Please note that it is not possible to include a discount for being awarded more than one lot.
If the same tenderer is evaluated with the highest score for more than one lot the tenderer will be awarded more than one lot provided the tenderer fulfils the aggregated minimum requirement for economic and financial standing cf. section 2.2.1 and section 4. The tender is divided into the following lots, and the value of the contracts is expected to amount to:
- Lot 1 - NEA: Expected value: EUR 42,550,000.00
- Lot 2 – NEA: Expected value: EUR 42,550,000.00
- Lot 3 – SLF02: Expected value: EUR 28,200,00.00 For further detail concerning the purchase, reference is made to the tender documents.
Awarded to
3 lots
- Lot 1 - NEA - Procurement of 400 kV cable systems (1)
- Lot 2 - NEA - Procurement of 400 kV cable systems (1)
- Lot 3 - SLF02 - Procurement of 400 kV and 132 kV cable systems (1)
CPV codes
European codes that classify what the contract is about. They are how we find the tenders for your trade.
31321300 31300000 31320000 31340000 31343000
Similar contracts already awarded
| Contract | Winner | Amount |
|---|---|---|
| 220 kV Submarine cable systems for the SLF02-project Energinet Eltransmission A/S · 23 September 2026 |
LS Cable & System Ltd | €20,578,268 |
Source : TED – Office des publications de l'Union européenne © Union européenne, données retraitées. Reference 577231-2026.