Call for tenders Services
Stadt Cottbus - VHVmöTw 204-2026 Entwicklung Gesamtschulstandort Joliot-Curie-Straße/Gartenstraße in Cottbus - Planung (HLS)
Notice published in German. The AI analysis summarises it for you in your language.
Applications due in 14 days — 6 November 2026 at 09:00
“I want this contract”: tracking, reminders and a bid file prepared by AI (eligibility, schedule, cover letter, technical proposal).
- Public buyer
- Stadtverwaltung Cottbus
Cottbus - Place of performance
- Cottbus
- Planned end of contract
- 31 December 2034
- Procedure
- Competitive negotiated procedure
You first submit an application; shortlisted candidates bid, then negotiate with the buyer. - Publication
- 7 October 2026
- Notice language
- German
AI analysis: go for it or not?
Summary in English, criteria, documents to provide and a GO / NO GO verdict in one minute.
Unlimited analyses during the 14-day Pro trial, no card needed.
Description
Im Sinne des Ganztagsanspruchs wird eine enge räumlich-funktionale Verknüpfung zwischen den auf dem Gelände befindlichen Gebäuden, u.a. zur Nutzung gemeinsamer Räume (z. B. Aula, Sporthalle oder Schule), angestrebt.
Als Grundlagenermittlung ist in den ersten Planungsphasen der beschriebene Standort mit seinen bereits vorhandenen Gebäudeteilen und flächenmäßigen Gegebenheiten zu untersuchen und daraus ein tragfähiges Nutzungskonzept für den Gesamtstandort in Abstimmung mit dem Nutzer/ Auftraggeber zu entwickeln. Ein besonderes Augenmerk gilt auch der Betrachtung der Sporthalle im Zuge der Grund-lagenermittlung. Der augenscheinlich desolate bauliche Zustand sowie die unzulänglichen räumlichen Kapazitäten können einen Ersatzneubau notwendig machen.
Es ist da-von auszugehen, dass voraussichtlich eine neue Zweifeld- Sporthalle den aktuellen Bestandsbau ersetzen wird. Die Baumaßnahme wird mindestens teilweise unter Weiternutzung erfolgen, da nur begrenzte Ausweichmöglichkeiten im Stadtgebiet zur Verfügung stehen. Der im Gebäude entlang der Gartenstraße befindliche Hort wird, nach Fertigstellung eines Ersatzneubaus an anderer Stelle im Stadtgebiet, das Gebäude zum Realisierungsbeginn verlassen haben.
Anhand der Tatsache der teilweisen Weiternutzung wird die Bauausführung in mehreren Bau-/ Teilabschnitten erfolgen. Ein entsprechendes Konzept zum Bauablauf ist, unter Berücksichtigung des notwendigen Bedarfes an räumlichen Kapazitäten, entsprechend zu planen und mit dem Nutzer abzustimmen. Im Fokus des Projektes steht ein zukunftsfähiger Standort, der konzeptionell durchgearbeitet werden und über sinnvoll zu bildende Bau- /Teilabschnitte in eine strukturierte und optimierte Realisierungsphase übergeleitet werden soll.
In Anlehnung an den Leitfaden für nachhaltiges Bauen des Bundesministeriums des Inneren, für Bau und Heimat sollen auch bei diesem Bauvorhaben Aspekte der Ökonomie, Ökologie, Soziokultureller und funktioneller Qualität sowie der technischen Qualität und der Prozessqualität betrachtet werden (keine Zertifizierung erforderlich). Die Baumaßnahme hat unter energetischen Aspekten mit Blick auf die Schonung natürlicher Ressourcen, während der Bauphase sowie in der Nutzungszeit, zu erfolgen. Der Planungsbeginn ist zum I.
Quartal 2027 angedacht. Die genauen Angaben entnehmen Sie bitte der Leistungsbeschreibung.
CPV codes
European codes that classify what the contract is about. They are how we find the tenders for your trade.
71000000 71240000
Winning prices for comparable contracts
- A quarter below
- €58,934
- Median
- €190,880
- A quarter above
- €536,430
Amounts awarded (excl. VAT) over the last 3 years for 570 contracts in the same CPV group (7100…), excluding framework agreements. Half of the contracts fall between the two quartiles. TED source: mostly contracts above the EU thresholds, so amounts tend to be high.
Likely competitors: who wins with this buyer in this field
- CDM Smith SE · 1 contract won
- SPIE SAG GmbH · 1 contract won
- Pahn Ingenieure GmbH · 1 contract won
- Planungsgruppe Prof. Sommer GmbH · 1 contract won
- GBA Gesellschaft für Bioanalytik mbH · 1 contract won
Partners and subcontractors
Contract too big or too broad for you alone? Bid as a temporary consortium, or offer your services as a subcontractor.
Create your free account to see who is looking for a partner on this contract, and to register.
Companies winning this type of contract in the region
- WILAB GmbH & Co. KG · 2 contracts won in 3 years
- Ingenieurgemeinschaft WTU GmbH · 2 contracts won in 3 years
- ASPHALTA Ingenieurgesellschaft für Verkehrsbau mbH · 2 contracts won in 3 years
- Dr. Löber IGV mbH · 1 contract won in 3 years
- Ingenieurbüro proVIA · 1 contract won in 3 years
- CDM Smith SE · 1 contract won in 3 years
- MEP Plan GmbH, Hofmühlenstraße 2, 01187 Dresden · 1 contract won in 3 years
- GMB GmbH, Knappenstraße 1, 01968 Senftenberg · 1 contract won in 3 years
Possible partners for a temporary consortium or subcontracting… and competitors worth knowing.
Similar contracts already awarded
| Contract | Winner | Amount |
|---|---|---|
| Stadt Cottbus OV 119-2026 Projektbegleitung bei der Altlastensanierung ehem. Potsdamer Chemiehandel Cottbus Stadtverwaltung Cottbus · 16 October 2026 |
CDM Smith SE | €296,692 |
| Stadt Cottbus - VHVmöTw 240-2025 Los 3 - Ausbau barrierefreies Sportzentrum Cottbus (Tragwerksplanung) Stadtverwaltung Cottbus · 23 September 2026 |
Pahn Ingenieure GmbH | €658,517 |
| Stadt Cottbus - VHVmöTw 192-2025 Entwicklung Gesamtschulstandort Joliot-Curie-Straße/Gartenstraße in Cottbus Stadtverwaltung Cottbus · 15 September 2026 |
Planungsgruppe Prof. Sommer GmbH | €2,535,435 |
| Stadt Cottbus - VHVmöTw 240-2025 Los 2 - Ausbau barrierefreies Sportzentrum Cottbus (Freianlagenplanung) Stadtverwaltung Cottbus · 4 September 2026 |
atelier8 | €1,828,256 |
| Stadt Cottbus - VHVmöTw 240-2025 Los 1 - Ausbau barrierefreies Sportzentrum Cottbus (Objektplanung: Gebäude und Innenräume) Stadtverwaltung Cottbus · 4 September 2026 |
architekturbüro fiedler & peter | €2,462,886 |
Source : TED – Office des publications de l'Union européenne © Union européenne, données retraitées. Reference 690288-2026.