Call for tenders Works
Avis rectificatif - systeme qualification reseaux (01.03.2024-28.02.29)
Notice published in French. The AI analysis summarises it for you in your language.
“I want this contract”: tracking, reminders and a bid file prepared by AI (eligibility, schedule, cover letter, technical proposal).
- Public buyer
- Société wallonne des eaux
Verviers - Place of performance
- 4800 Verviers, Liège
- Publication
- 19 March 2026
- Notice language
- French
AI analysis: go for it or not?
Summary in English, criteria, documents to provide and a GO / NO GO verdict in one minute.
Unlimited analyses during the 14-day Pro trial, no card needed.
Description
AVIS RECTIFICATIF - SYSTEME DE QUALIFICATION RESEAUX (01/03/2024 - 28/02/2029) Modification de l'exigence diplôme en fontainerie Système de qualification d'entreprises au sein de la SWDE, système "Réseaux", applicable du 01/03/2024 jusqu'au 28/02/2029, utilisé dans le cadre de la réalisation de travaux de pose de canalisations destinées au transport et à la distribution d'eau. Le classement est réalisé par classes d'agréation. Il comprend 8 listes basées sur les 8 classes d'agréation.
Le système de qualification repose notamment sur la possession d'une agréation d'entrepreneur en sous-catégorie C2. Les lieux d'exécution des travaux se situent sur le territoire de la Région Wallonne. Sur base du montant estimé des travaux à réaliser, l'adjudicateur invitera à participer à la procédure de marché public l'ensemble des entrepreneurs disposant de la classe d'agréation estimée, ceux disposant d'une classe d'agréation supérieure, ainsi que ceux disposant d'une classe directement inférieure à la classe estimée.
Ex: Classe 5 estimée Seront invités les entrepreneurs figurant dans la liste de la classe 5, ceux disposant d'une classe 6 ou 7 ou 8 ainsi que ceux figurant dans la liste de la classe 4. L'adjudicateur conserve toutefois le droit d'opérer une seconde sélection à l'intérieur du système de qualification pour choisir les candidats auxquels il va demander de remettre offre. IMPORTANT: l'exigence en fontainerie augmente: à partir du 01/06/2026: DEUX membres du personnel doivent disposer d'un diplôme en fontainerie.
PERIODE TRANSITOIRE : a. POUR LES SOCIETES FAISANT DÉJÀ PARTIE DU SYSTÈME DE QUALIFICATION Pour le 15/05/2026 au plus tard, les sociétés devront avoir complétés leur dossier en déposant sur e-procurement le diplôme d’un 2ème ouvrier en fontainerie. Elles pourront ainsi conserver leur place dans les listes. b.
POUR LES SOCIETES NE FAISANT PAS ENCORE PARTIE DU SYSTÈME DE QUALIFICATION L’exigence d’un ouvrier diplômé en fontainerie/entreprise restera valable jusqu’au 15/05, ceci afin de respecter l’égalité de traitement avec les autres sociétés. Néanmoins, le diplôme d’un 2ème ouvrier en fontainerie devra nous être communiqué pour le 15/05 au plus tard via e-procurement pour conserver sa place dans les listes du système de qualification. Exclusion: Les sociétés qui n'auront pas déposé le diplôme de deux ouvriers en fontainerie par entreprise au plus tard le 15/05/2026 seront exclues des listes à partir du 01/06/2026.
Elles pourront redéposer un dossier de candidature complet sur e-procurement à tout moment.
CPV codes
European codes that classify what the contract is about. They are how we find the tenders for your trade.
45231110 45232150 65100000
Winning prices for comparable contracts
- A quarter below
- €4,592,932
- Median
- €7,193,411
- A quarter above
- €9,344,351
Amounts awarded (excl. VAT) over the last 3 years for 164 contracts in the same CPV group (4523…), excluding framework agreements. Half of the contracts fall between the two quartiles. TED source: mostly contracts above the EU thresholds, so amounts tend to be high.
Likely competitors: who wins with this buyer in this field
- Denys · 1 contract won
- TRBA · 1 contract won
- LITRAN · 1 contract won
- ENTREPRISES HYDROGAZ · 1 contract won
- TEGEC · 1 contract won
Partners and subcontractors
Contract too big or too broad for you alone? Bid as a temporary consortium, or offer your services as a subcontractor.
Create your free account to see who is looking for a partner on this contract, and to register.
Companies winning this type of contract in the region
- ENTREPRISES HYDROGAZ · 3 contracts won in 3 years
- TEGEC · 2 contracts won in 3 years
- ELOY TRAVAUX · 2 contracts won in 3 years
- SM TEGEC-SOCOGETRA · 1 contract won in 3 years
- DUBOIS DAWANCE TRAVAUX SA · 1 contract won in 3 years
- Denys · 1 contract won in 3 years
- SM ARGEA-ACH-SADE · 1 contract won in 3 years
- René LEJEUNE et Fils · 1 contract won in 3 years
Possible partners for a temporary consortium or subcontracting… and competitors worth knowing.
Similar contracts already awarded
| Contract | Winner | Amount |
|---|---|---|
| SR 6.3.1.1 - Liaison entre le réservoir de l’Arbre à la Croix à Grâce-Hollogne et le Réservoir de Nalamont à Ohey - Tronçon 3.1.1.-1 R Société wallonne des eaux · 26 February 2026 |
Denys | €15,998,000 |
| SRRE 8.8.2 - Adduction Ghlin-Gaurain-Ramecroix - Pose de canalisations destinées au transport d'eau potable Société wallonne des eaux · 15 October 2025 |
TRBA LITRAN |
€7,943,666 |
| SR 9.1.5 - Ramillies - Dédoublement de conduites d'adduction Société wallonne des eaux · 9 October 2025 |
TEGEC ENTREPRISES HYDROGAZ |
€4,593,375 |
| SRRE 7.5 - Construction d'un château d'eau de 2000m³ à Mesnil-Commune de HOUYET Société wallonne des eaux · 24 June 2025 |
DUCHENE | €7,103,588 |
| WA/OND/D100/2026/1 Wegenonderhoud in de vervoersregio Kempen Perceel 1: VVR Kempen noord Perceel 2: VVR Kempen zuid Vlaamse Overheid · 19 October 2026 |
Van Doorn Geldermalsen Bv | €9,097,904 |
Source : TED – Office des publications de l'Union européenne © Union européenne, données retraitées. Reference 192847-2026.