Award notice Works
Construction of Zaghloul El Bahary Wastewater Treatment Plant (WWTP), Design – Build, Defect Liability Year, and Optional One (1) Year of Operation and Maintenance
- Public buyer
- Kafr El-Sheikh Water Supply and Sanitation Company (KSWSSC), Project Implementation Unit (PIU)
Kafr El-Sheikh City - Place of performance
- Kafr el Sheikh Governorate
- Estimated value
- €23,000,000 excl. VAT
- Amount awarded
- €24,943,649 excl. VAT
- Planned end of contract
- 23 November 2027
likely re-tender around May 2027 - Bids received
- 1
- Procedure
- Open procedure
Any company may submit a bid. - Publication
- 3 September 2026
- Notice language
- English
What is the authority looking for?
Works
The work to be carried out under this works contract comprises the permanent works (facilities and systems) related to the new Zaghoul El Bahary WWTP (15,000 m3/d, 2037 expanded to 25,000 m3/d, 2052) in Motobas District, Kafr El Sheikh Governorate, to be designed, constructed, and commissioned; the effective restorati…
Where and when?
Kafr el Sheikh Governorate (buyer's address)
Deadline not published in the notice
Site visit and deadline for questions: stated in the specifications, not in the notice.
What budget?
€23,000,000 excl. VAT amount estimated by the buyer
Why is this tender relevant to me?
Create your free account : we compare every tender with your trade and your area.
Can I consider bidding?
The AI analysis extracts the participation conditions, the contractor approval and the required documents. See the analysis and the verdict for your company
Nothing is assumed: what the notice does not say is marked "to check".
What do I need to do?
1. Read the analysis · 2. Check that you meet the conditions · 3. Prepare the response · 4. Submit on the official platform before the deadline.
AI analysis: go for it or not?
Summary in English, criteria, documents to provide and a GO / NO GO verdict in one minute.
Unlimited analyses during the 14-day Pro trial, no card needed.
Description
The work to be carried out under this works contract comprises the permanent works (facilities and systems) related to the new Zaghoul El Bahary WWTP (15,000 m3/d, 2037 expanded to 25,000 m3/d, 2052) in Motobas District, Kafr El Sheikh Governorate, to be designed, constructed, and commissioned; the effective restoration of any defects during the 1-year Defects Liability Period; and the optional 1-year of normal operation and maintenance of the works for the WWTP. The contract comprises also the provision of training services to the Procuring Entity’s personnel duly completed within the Defects Liability Period or the Optional 1 year Operation and Maintenance Period as the case may be, and before the works hand-over. Some minor works of the Plant has been executed by another Contractor in a previous phase.
Although not part of the Works, the Contractor shall be aware of its obligations toward these Existing Works as defined in the Contract Documents.
Awarded to
CPV codes
European codes that classify what the contract is about. They are how we find the tenders for your trade.
45200000
Winning prices for comparable contracts
- A quarter below
- €7,469,452
- Median
- €13,998,462
- A quarter above
- €28,907,788
Amounts awarded (excl. VAT) over the last 3 years for 10 contracts in the same CPV group (4520…), excluding framework agreements. Half of the contracts fall between the two quartiles. TED source: mostly contracts above the EU thresholds, so amounts tend to be high.
Similar contracts already awarded
| Contract | Winner | Amount |
|---|---|---|
| Bouw overslagstation met overslaghal, kantoorgebouw, stelplaats en buitenaanleg EcoWerf · 22 October 2026 |
BOUWBEDRIJF KEULEN HENRI | €6,171,195 |
| Campus ardoyen – 123 gains cleanroom: uitbreiding - bouwwerken + piloot Universiteit Gent · 11 September 2026 |
CORDEEL BELGIUM | €4,388,350 |
| Restructuration du bâtiment de Chimie B6a Université de Liège · 6 July 2026 |
LES ENTREPRISES MOURY sa ANALIS sa |
€30,229,168 |
| Seine-Schelde. Leie. Herbouw wegbrug te Wevelgem - Lauwe. De Vlaamse Waterweg nv · 28 April 2026 |
TM nv Hye – nv Verhelst – nv CSM | €33,401,668 |
| WL/INV/N79/3/U5 N79 Tongeren: Omleidingsweg fase 3 Vlaamse Overheid · 7 April 2026 |
TM Willemen Bouw Infra | €17,968,650 |
Source : TED – Office des publications de l'Union européenne © Union européenne, données retraitées. Reference 607930-2026.